Kušar, Janez, 1958-
Kušar, Janez
Janez Kušar
VIAF ID: 305527247 (Personal)
Permalink: http://viaf.org/viaf/305527247
Preferred Forms
- 100 0 _ ‡a Janez Kušar
- 100 1 _ ‡a Kušar, Janez
-
- 100 1 _ ‡a Kušar, Janez, ‡d 1958-
4xx's: Alternate Name Forms (5)
Works
Title | Sources |
---|---|
ABC analiza s tremi premicami | |
Analiza koristnosti in stroškov : zaključna naloga univerzitetnega študijskega programa I. stopnje Strojništvo | |
Application of Petri Net theory in development of concurrent engineering | |
Building a concurrent engineering support information system | |
Capacity planning models for FMS | |
Cost benefit analysis | |
DEMI 2023 | |
Direct Algorithms in Optimal Path Control – Local Variations Method | |
Doseganje norme in HI2 test | |
Durchlaufzeit - Auswahl und Einführung von PPS-Systeme : Jun. 1994-Sept. 1997 | |
Extended ABC analysis | |
Fast changeover of series - SMED method | |
Finding and evaluating customers needs in the product-development process | |
Hitra menjava serij - SMED metoda | |
"House of quality" as a method of concurrent engineering | |
The influence of concurrent engineering on launch-to-finish time | |
Izbrana poglavja iz operacijskih raziskav | |
KOI '94 : zbornik radova | |
Konferencija iz operacijskih istraživanja | |
Kriteriji presojanja primernosti JIT proizvodnje | |
Math formulation of PPC system | |
A max-plus algebra approach for generating a non-delay schedule | |
Metode kreativnosti in timsko delo | |
Mrežno planiranje : vaje | |
Načrtovanje materialnih potreb = [Material requirements planning] : diplomska naloga | |
Optimal PPC system selection for computer integrated production system | |
Optimal scheduling of jobs in FMS | |
Optimalna razmestitev delovnih sredstev = [Optimal arrangement of working equipment] : diplomska naloga | |
Optimizacija razmestitve delovnih mest | |
Pisarna projektnega vodenja = [Project management office] : diplomska naloga | |
Planiranje in krmiljenje proizvodnje ter vodenje projektov | |
Planning concurrent engineering workgroups in small companies | |
Podjetništvo : seminar za mlade raziskovalce | |
Prenova projektnega informacijskega sistema podjetja : magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo | |
Priprava za uspešno vodenje projektov | |
Proceedings of the 10th International Conference on Operational Research - KOI 2004 : Trogir, Croatia, September 22-24, 2004 | |
Product and process development in distributed production units | |
Program razvoja Luke Koper do leta 2000. | |
Project management of product development | |
Project of managing the investment process | |
Projekt obvladovanja investicijskega procesa | |
Projektno vodenje naročil : diplomska naloga univerzitetnega študija | |
Projektno vodenje v sistemu naročil : OC1-i1 nove tehnologije. | |
QFD as a method of integrated product implementation | |
Quality functions deployment | |
Reducing takeover process time of glow plugs with pressure sensor | |
Selecting the most adaptable work equipment | |
Selecting the most appropriate U-cell for the installation of starters. | |
Simulation of cost driven value stream mapping | |
Sistem napredovalnih števil | |
Snemanje časov | |
Sočasno osvajanje izdelkov : diplomska naloga | |
Software tool for monitoring lean production | |
Spatial distribution of jobs | |
Standard risk management model for infrastructure projects : chapter 1 | |
The state of orders on machines | |
Strategije uvedbe sočasnega inženiringa | |
Strojniški priročnik | |
The transformation of production line to U-cell | |
Using the lean methods in circuit assembly in the individual and small-scale production | |
Utility analysis | |
Uvajanje C-tehnologij v individualno in maloserijsko proizvodnjo | |
Uvajanje sistema stalnih izboljšav - analiza toka materiala SMED in 5S v podjetju Polycom Škofja Loka d. o. o. | |
Uvedba sočasnega inženirstva v proces osvajanja izdelkov | |
Uvedba vitke proizvodnje z uporabo analize toka vrednosti : diplomska naloga | |
Uvod v tehniko mrežnega planiranja | |
Value stream mapping - step towards lean production | |
Virtual development teams in today's global world | |
Vpliv avtomatizacije procesa namestitve lepilnega traku na učinkovitost proizvodnje | |
Vpliv skupne učinkovitosti opreme na vitkost proizvodnje : diplomska naloga visokošolskega strokovnega študija | |
VSM analiza izdelkov, ki zahtevajo 2 operaciji (brizganje, klemanje) | |
Zmanjševanje zalog embalaže in materiala s ciljem pridobiti več prostora oziroma paletnih mest |