Bangladesh. Ministry of Water Resources
Ministry of Water Resources (Bangladesh)
Bangladesch Ministry of Water Resources
Ministry of Water Resources
VIAF ID: 145745033 ( Corporate )
Permalink: http://viaf.org/viaf/145745033
Preferred Forms
4xx's: Alternate Name Forms (5)
5xx's: Related Names (1)
- 551 _ _ ‡a Bangladesch
Works
Title | Sources |
---|---|
Annual report. | |
An atlas of selected maps and spacial data in Bangladesh. | |
Bāṃlādeśe pāni o su śāsana : pāni āina samūhera saṃkalana | |
Baseline information study of the Dhaka Combined Flood Control cum Eastern Bypass Road Project : final report. | |
Command area development project (PIRDP & MDIP) : ADB Loan No. 1339-BAN (SF) : Ministry of Water Resources - Asian Development Bank | |
Consolidation and strengthening of flood forecasting and warning services : updating and validation of general model and six regional models, inception report. | |
Consultancy services for engineering services : application for pre-qualification | |
Development of computer model for Chandpur Irrigation Project (extension) | |
Feasibility study polder 61/1 Sitakunda | |
Gorai River Re-excavation Project for Gorai River restoration : pilot priority works : hydraulic quality control of dredging, final report, June 2000. | |
Guidelines for participatory water management | |
Integrated Coastal Resource Database Integrated Coastal Zone Management Plan Project : District Development Plan. | |
Jātīẏa pāni nīti. | |
Late monsoon flood in the Southwest region of Bangladesh 2000. | |
Maintenance of twodimensional general model of the Meghna Estuary | |
Mathematical modelling and engineering survey & investigation in feasibility study for comprehensive South Comilla and North Noakhali Drainage Project : draft final report. | |
Microwave remote sensing applications for flood monitoring | |
OGDA studies | |
Options for the Ganges dependent area | |
Pāni Sampada Mantraṇālaẏera bārshika pratibedana. | |
Proceedings of the Fourth Conference on the Flood Action Plan. | |
Protection of the Padma left bank at Hasail-Garurgaon, Louhajang, and Harirampur | |
Second Coastal Embankment Rehabilitation Project : hydraulic modelling study : draft final report. | |
Seminar proceedings | |
Special monitoring of rivers and tidal basins for tidal river management : final report, December 2002. | |
Study of river erosion of Meghna along Meghna Dhonagoda Irr. Project and Jamuna along Pabna Irrigation & Rural Dev. Project : requirement of modelling and data for feasibility study of erosion protection measures : final report. | |
Study of upgrading and rehabilitation of (a) Karnafuly Irrigation Project (Halda & Ichamoti Unit), (b) Fatikchari FCDI Project, (c) Halda Extension Irrigation Project and (d) Nischintapur FCDI Project with ESIA in Hathazari, Rauzan, Rangunia and Fatikchari upazillas in Chittagong District : final report : Karnafuly Irrigation Project (Ichamoti Unit). | |
Surveys and mathematical modelling to support the design work of Gorai River Restoration Project : final report, August 2001. | |
Twenty second March World Water Day : 2019 leaving no one behind | |
Two-diment[sic]ional morphological modelling for Sariakandi Bank protection work, Site B1 : forecast of critical hydraulic and morphological condition in 2000 monsoon, final report. | |
Water governance in Bangladesh : compendium of water laws | |
Water resources management and development in Bangladesh with particular reference to the Ganges River |