Administrative action, state environmental assessment/finding of no significant impact |
|
County road maps : maintenance maps by counties with enlarged municipal and suburban areas |
|
Economic impact of airports in North Carolina |
|
Estimating the magnitude and frequency of floods in rural basins of North Carolina |
|
Final report for duty cycle performance test of retread tires |
|
Interim report of the Governor's Rail Passenger Task Force : to Governor James G. Martin. |
|
Investigation of differences in deterioration of two North Carolina bridges due to alkali-silica reactivity (ASR) |
|
Low light as a possible impediment to river herring migration |
|
Macon-Charlotte southeast high speed rail corridor plan : final report : proposed high speed rail operating between Charlotte, North Carolina, Greenville-Spartenburg, South Carolina, Atlanta and Macon, Georgia |
|
Measurement of locomotive head end power engine fuel and emissions : draft final report |
|
NC 84, NC 16 to SR 1008 (Waxhaw-Indian Trail Road) in Wesley Chapel, construct four lane roadway, part on new location, Union County, federal aid project no. STP-1316(10), WBS no. 39019.1.1, STIP no. U-3467 : project commitments |
|
North Carolina aeronautical chart. |
|
North Carolina coastal boating guide, 1988-1989. |
|
North Carolina ferry system schedule, 2003 |
|
North Carolina scenic byways |
|
North Carolina traffic accident summary |
|
North Carolina urban transit operating statistics |
|
North Carolina's statewide guide to major road construction for spring/summer 2002 |
|
Operational capacity of three-lane cross-sections |
|
Record of decision : Complete 540 : Triangle Expressway, southeast extension. |
|
Record of decision for NC 12 - Rodanthe Breach long-term improvements Bonner Bridge replacement project phase IIb, federal aid no. BRNHF-0012(56), NCDOT project definition: 32635, TIP project no. B-2500B, Dare County, North Carolina |
|
Report of Governor's Blue Ribbon Commission on Transportation Needs and Financing : technical report |
|
Report of the controller for fiscal year ended ... |
|
Report on the North Carolina Railroad Company and Atlantic & North Carolina Railroad Company for the General Assembly of North Carolina, December 22, 1976. |
|
Rural speeds on primary highways and secondary roads |
|
Southeast High Speed Rail, Washington, DC to Charlotte, NC : tier I final environmental impact statement, June 2002 |
|
Southeast regional fatal study : a causal chain analysis in North Carolina |
|
Standard specifications for roads and structures |
|
State of North Carolina highway detour bulletin. |
|
Statewide transportation plan |
|
TIP, moving into a new century |
|
Transportation 2001, setting a new pace for a new century |
|
Transportation improvement program |
|
Transportation indicators, North Carolina, 1983: |
|
U.S. 70 improvements from US 70 business to the Neuse River bridge, Johnston County, federal aid project no. HISP-0070(163), WBS element 50056.1.1, STIP project no. W-5600 : administrative action, categorical exclusion |
|
US 64 improvements project, draft environmental impact statement |
|
Watershed-based planning, functional assessment of loss mitigation, and continuing research |
|