Productivity Press. Development Team
VIAF ID: 125664906 ( Corporate )
Permalink: http://viaf.org/viaf/125664906
Preferred Forms
-
- 110 2 _ ‡a Productivity Press ‡b Development Team
- 110 2 0 ‡a Productivity Press ‡b Development Team
- 110 2 _ ‡a Productivity Press ‡b Development Team
-
- 110 2 _ ‡a Productivity Press. Development Team
- 110 2 _ ‡a Productivity Press. ‡b Development Team
- 110 2 0 ‡a Productivity Press. ‡b Development Team
-
4xx's: Alternate Name Forms (5)
5xx's: Related Names (6)
- 551 _ _ ‡a New York, NY
- 551 _ _ ‡a Portland, Or.
- 510 2 _ ‡a Productivity Development Team (Productivity Press)
- 510 2 0 ‡a Productivity Development Team (Productivity Press)
- 510 2 _ ‡a Productivity Press Portland, Or
- 510 2 _ ‡a Productivity Press ‡e Ueberordnung
Works
Title | Sources |
---|---|
5S dla operatorów : 5 filarów wizualizacji miejsca pracy | |
5S dla operatorów / oprac. przez The Productivity Press Development Team. - Wrocław, 2008. | |
5S for operators : 5 pillars of the visual workplace | |
Autonomiczne utrzymanie ruchu : dla operatorów | |
Cellular manufacturing one-piece flow for workteams | |
Fabricación celular : desarrollo de células de fabricación | |
Gniazdo produkcyjne : przepływ jednej sztuki dla zespołów roboczych | |
Identifying waste on the shopfloor | |
Jishu hozen no susumekata | |
Just-in-time for operators, 1998: | |
Lean supply chain : collected practices and cases | |
Mistake-proofing for operators | |
Modeling for learning organizations | |
OEE dla operatorów : całkowita efektywność wyposażenia | |
OEE for operators : Overall Equipment Effectiveness | |
Preparaciones rápidas de máquinas : el sistema SMED | |
Quick changeover for operators : the SMED system | |
A revolution in manufacturing | |
Standard work for the shopfloor | |
Standaryzacja pracy na hali produkcyjnej | |
TPM : dla każdego operatora | |
TPM for supervisors | |
Watashitachi no TPM | |
Zapobieganie błędom dla operatorów : system ZQC |